Monday, August 06, 2007

Bits & Pieces

I've found myself with more time to plan projects than to work on them recently. I've been planning both knitting and sewing projects (and beading and scrapbooking projects, too, now that I think about it) right and left. I've even ordered materials for several of them.

But, I did get the other front/back piece for my striped sweater done up to the armhole bind-offs on the train last week. Commuting is so much more pleasant when I get to knit or read instead of driving. And I'm possibly planning another sweater using the Rowanspun 4-ply pictured in my last post, but the only-partially justified gauge woes (I haven't even swatched yet) are a whole other post. There's a pattern that caught my eye in the preview for the Fall IK that I'm really hoping I'll be able to knit with this yarn.

I recently got a ball winder, which will make winding all those hanks a lot easier. I've wound almost all of my leftover odds and ends into wonderful little center-pull balls, but I'm going to need to build a swift before I can wind up the Rowanspun. I got my boyfriend to be a human swift by wearing a skein around his shoulders, but he declined to repeat the favor for the other 16 skeins. What a spoilsport.

And best of all, there are now only 307 people ahead of me on the Ravelry wait list. So close!

No comments: